Tambi, Tambi, Indonesia
-
Vol 5, No 1 (2013) - EDITORIAL TEAM
KEANDALAN DISTRIBUSI PRIMER TERHADAP UNJUK KERJA SUTM 20 KV PADA PT. PLN CABANG KENDARI
Abstract -
Vol 3, No 2 (2012) - EDITORIAL TEAM
DAMPAK DARI FACTS CONTROLLER PADA KEANDALAN GABUNGAN SISTEM PEMBANGKITAN DAN TRANSMISI DAYA LISTRIK
Abstract -
Vol 4, No 1 (2012) - EDITORIAL TEAM
PEMODELAN DAN PENGENDALIAN MOTOR LISTRIK 15 HP 240 VOLT 2500 RPM
Abstract -
Vol 3, No 1 (2011) - EDITORIAL TEAM
ANALISA STABILITAS TRANSIEN SISTEM TENAGA LISTRIK BERDASARKAN WAKTU PEMUTUSAN KRITIS
Abstract -
Vol 1, No 2 (2010) - EDITORIAL TEAM
OPTIMASI PEMBANGKIT DENGAN MENGGUNAKAN METODE GRADIENT ORDE DUA
Abstract